Construction is the process of constructing a building or infrastructure. Construction differs from manufacturing in that manufacturing typically involves mass production of similar items without a designated purchaser, while construction typically takes place on location for a known client. Construction as an industry comprises six to nine percent of the gross domestic product of developed countries. Construction starts with planning, design, and financing; it continues until the project is built and ready for use.

 अत्यधिक पढ़ा गया लेख: 8M+ Viewers
सनातन संस्कृति मे पौराणिक कथाओं के साथ-साथ मंत्र, आरती और पुजा-पाठ का विधि-विधान पूर्वक वर्णन किया गया है। यहाँ पढ़े:-

Large-scale construction requires collaboration across multiple disciplines. A project manager normally manages the job, and a construction manager, design engineer, construction engineer or architect supervises it. Those involved with the design and execution must consider zoning requirements, environmental impact of the job, scheduling, budgeting, construction-site safety, availability and transportation of building materials, logistics, inconvenience to the public caused by construction delays and bidding. Large construction projects are sometimes referred to as megaprojects.

Etymology

Construction is a general term meaning the art and science to form objects, systems, or organizations,[4] and comes from Latin constructionem (from com- “together” and struere “to pile up”) and Old French construction.[5] Construction is used as a verb: the act of building, and a noun: how a building was built, the nature of its structure.

Types

In general, there are three sectors of construction: buildings, infrastructure and industrial. Building construction is usually further divided into residential and non- residential (commercial/institutional). Infrastructure is often called heavy civil or heavy engineering that includes large public works, dams, bridges, highways, railways, water or wastewater and utility distribution. Industrial construction includes refineries, process chemical, power generation, mills and manufacturing plants. There are also other ways to break the industry into sectors or markets.

Industry sectors

Engineering News-Record (ENR), a trade magazine for the construction industry, each year compiles and reports data about the size of design and construction companies. In 2014, ENR compiled the data in nine market segments divided as transportation, petroleum, buildings, power, industrial, water, manufacturing, sewer/waste, telecom, hazardous waste and a tenth category for other projects. In their reporting, they used data on transportation, sewer, hazardous waste and water to rank firms as heavy contractors.

The Standard Industrial Classification and the newer North American Industry Classification System have a classification system for companies that perform or engage in construction. To recognize the differences of companies in this sector, it is divided into three subsectors: building construction, heavy and civil engineering construction, and specialty trade contractors. There are also categories for construction service firms (e.g., engineering, architecture) and construction managers (firms engaged in managing construction projects without assuming direct financial responsibility for completion of the construction project).

Building construction

Learn moreThis section needs additional citations for verification.
Building construction is the process of adding structure to real property or construction of buildings. The majority of building construction jobs are small renovations, such as addition of a room, or renovation of a bathroom. Often, the owner of the property acts as laborer, paymaster, and design team for the entire project. Although building construction projects consist of common elements such as design, financial, estimating and legal considerations, projects of varying sizes may reach undesirable end results, such as structural collapse, cost overruns, and/or litigation. For this reason, those with experience in the field make detailed plans and maintain careful oversight during the project to ensure a positive outcome.

The National Cement Share Company of Ethiopia’s new plant in Dire Dawa
Commercial building construction is procured privately or publicly utilizing various delivery methodologies, including cost estimating, hard bid, negotiated price, traditional, management contracting, construction management-at-risk, design & build and design-build bridging.

Residential construction practices, technologies, and resources must conform to local building authority regulations and codes of practice. Materials readily available in the area generally dictate the construction materials used (e.g. brick versus stone, versus timber). Cost of construction on a per square meter (or per square foot) basis for houses can vary dramatically based on site conditions, local regulations, economies of scale (custom designed homes are often more expensive to build) and the availability of skilled tradesmen. Residential construction as well as other types of construction can generate waste such that planning is required.

According to McKinsey research, productivity growth per worker in construction has lagged behind many other industries across different countries including in the United States and in European countries. In the United States, construction productivity per worker has declined by half since the 1960s.

Residential construction

The most popular method of residential construction is wood-framed construction. Typical construction steps for a single-family or small multi-family house are:

  • Obtain an engineered soil test of lot where construction is planned. From an engineer or company specializing in soil testing.
  • Develop floor plans and obtain a materials list for estimations (more recently performed with estimating software)
  • Obtain structural engineered plans for foundation and structure. To be completed by either a licensed engineer or architect. To include both a foundation and framing plan.
  • Obtain lot survey
  • Obtain government building approval if necessary
  • If required obtain approval from HOA (homeowners association) or ARC (architectural review committee)
  • Clear the building site (demolition of existing home if necessary)
  • Survey to stake out for the foundation
  • Excavate the foundation and dig footers (Scope of work is dependent of foundation designed by engineer)
  • Install plumbing grounds
  • Pour a foundation and footers with concrete
  • Build the main load-bearing structure out of thick pieces of wood and possibly metal I-beams for large spans with few supports. See framing (construction)
  • Add floor and ceiling joists and install subfloor panels
  • Cover outer walls and roof in OSB or plywood and a water-resistive barrier.
  • Install roof shingles or other covering for flat roof
  • Cover the walls with siding, typically vinyl, wood, or brick veneer but possibly stone or other materials
  • Install windows
  • Frame interior walls with wooden 2×4s
  • Add internal plumbing, HVAC, electrical, and natural gas utilities
  • Building inspector visits if necessary to approve utilities and framing
  • Install insulation and interior drywall panels (cementboard for wet areas) and to complete walls and ceilings
  • Install bathroom fixtures
  • Spackle, prime, and paint interior walls and ceilings
  • Additional tiling on top of cementboard for wet areas, such as the bathroom and kitchen backsplash
  • Installation of final floor covering, such as floor tile, carpet, or wood flooring
  • Installation of major appliances
  • Unless the original owners are building the house, at this point it is typically sold or rented.

[ Processes ]

Design team

In the industrialized world, construction usually involves the translation of designs into reality. A formal design team may be assembled to plan the physical proceedings, and to integrate those proceedings with the other parts. The design usually consists of drawings and specifications, usually prepared by a design team including architect, civil engineers, mechanical engineers, electrical engineers, structural engineers, fire protection engineers, planning consultants, architectural consultants, and archaeological consultants. The design team is most commonly employed by (i.e. in contract with) the property owner. Under this system, once the design is completed by the design team, a number of construction companies or construction management companies may then be asked to make a bid for the work, either based directly on the design, or on the basis of drawings and a bill of quantities provided by a quantity surveyor. Following evaluation of bids, the owner typically awards a contract to the most cost efficient bidder.

The best modern trend in design is toward integration of previously separated specialties, especially among large firms. In the past, architects, interior designers, engineers, developers, construction managers, and general contractors were more likely to be entirely separate companies, even in the larger firms. Presently, a firm that is nominally an “architecture” or “construction management” firm may have experts from all related fields as employees, or to have an associated company that provides each necessary skill. Thus, each such firm may offer itself as “one-stop shopping” for a construction project, from beginning to end. This is designated as a “design build” contract where the contractor is given a performance specification and must undertake the project from design to construction, while adhering to the performance specifications.

Several project structures can assist the owner in this integration, including design-build, partnering and construction management. In general, each of these project structures allows the owner to integrate the services of architects, interior designers, engineers and constructors throughout design and construction. In response, many companies are growing beyond traditional offerings of design or construction services alone and are placing more emphasis on establishing relationships with other necessary participants through the design-build process.

The increasing complexity of construction projects creates the need for design professionals trained in all phases of the project’s life-cycle and develop an appreciation of the building as an advanced technological system requiring close integration of many sub-systems and their individual components, including sustainability. Building engineering is an emerging discipline that attempts to meet this new challenge.

 अत्यधिक पढ़ा गया लेख: 8M+ Viewers
सनातन संस्कृति मे पौराणिक कथाओं के साथ-साथ मंत्र, आरती और पुजा-पाठ का विधि-विधान पूर्वक वर्णन किया गया है। यहाँ पढ़े:-

Financial advisors

Construction projects can suffer from preventable financial problems. Underbids happen when builders ask for too little money to complete the project. Cash flow problems exist when the present amount of funding cannot cover the current costs for labour and materials, and because they are a matter of having sufficient funds at a specific time, can arise even when the overall total is enough. Fraud is a problem in many fields, but is notoriously prevalent in the construction field.[14] Financial planning for the project is intended to ensure that a solid plan with adequate safeguards and contingency plans are in place before the project is started and is required to ensure that the plan is properly executed over the life of the project.

Mortgage bankers, accountants, and cost engineers are likely participants in creating an overall plan for the financial management of the building construction project. The presence of the mortgage banker is highly likely, even in relatively small projects since the owner’s equity in the property is the most obvious source of funding for a building project. Accountants act to study the expected monetary flow over the life of the project and to monitor the payouts throughout the process. Cost engineers and estimators apply expertise to relate the work and materials involved to a proper valuation. Cost overruns with government projects have occurred when the contractor identified change orders or project changes that increased costs, which are not subject to competition from other firms as they have already been eliminated from consideration after the initial bid.

Large projects can involve highly complex financial plans and often start with a conceptual estimate performed by a building estimator. As portions of a project are completed, they may be sold, supplanting one lender or owner for another, while the logistical requirements of having the right trades and materials available for each stage of the building construction project carries forward. In many English-speaking countries, but not the United States, projects typically use quantity surveyors.

Legal aspects

A construction project must fit into the legal framework governing the property. These include governmental regulations on the use of property, and obligations that are created in the process of construction.

When applicable, the project must adhere to zoning and building code requirements. Constructing a project that fails to adhere to codes does not benefit the owner. Some legal requirements come from malum in se considerations, or the desire to prevent indisputably bad phenomena, e.g. explosions or bridge collapses. Other legal requirements come from malum prohibitum considerations, or factors that are a matter of custom or expectation, such as isolating businesses from a business district or residences from a residential district. An attorney may seek changes or exemptions in the law that governs the land where the building will be built, either by arguing that a rule is inapplicable (the bridge design will not cause a collapse), or that the custom is no longer needed (acceptance of live-work spaces has grown in the community).

A construction project is a complex net of contracts and other legal obligations, each of which all parties must carefully consider. A contract is the exchange of a set of obligations between two or more parties, but it is not so simple a matter as trying to get the other side to agree to as much as possible in exchange for as little as possible. The time element in construction means that a delay costs money, and in cases of bottlenecks, the delay can be extremely expensive. Thus, the contracts must be designed to ensure that each side is capable of performing the obligations set out. Contracts that set out clear expectations and clear paths to accomplishing those expectations are far more likely to result in the project flowing smoothly, whereas poorly drafted contracts lead to confusion and collapse.

Legal advisors in the beginning of a construction project seek to identify ambiguities and other potential sources of trouble in the contract structure, and to present options for preventing problems. Throughout the process of the project, they work to avoid and resolve conflicts that arise. In each case, the lawyer facilitates an exchange of obligations that matches the reality of the project.

Interaction of expertise

Design, finance, and legal aspects overlap and interrelate. The design must be not only structurally sound and appropriate for the use and location, but must also be financially possible to build, and legal to use. The financial structure must accommodate the need for building the design provided, and must pay amounts that are legally owed. The legal structure must integrate the design into the surrounding legal framework, and enforce the financial consequences of the construction process.

Procurement

Procurement describes the merging of activities undertaken by the client to obtain a building. There are many different methods of construction procurement; however, the three most common types of procurement are traditional (design–bid–build), design-build and management contracting.

There is also a growing number of new forms of procurement that involve relationship contracting where the emphasis is on a co-operative relationship among the principal, the contractor, and other stakeholders within a construction project. New forms include partnering such as Public-Private Partnering (PPPs) aka private finance initiatives (PFIs) and alliances such as “pure” or “project” alliances and “impure” or “strategic” alliances. The focus on co-operation is to ameliorate the many problems that arise from the often highly competitive and adversarial practices within the construction industry.

Traditional

Main article: Design–bid–build
This is the most common method of construction procurement and is well established and recognized. In this arrangement, the architect or engineer acts as the project coordinator. His or her role is to design the works, prepare the specifications and produce construction drawings, administer the contract, tender the works, and manage the works from inception to completion. There are direct contractual links between the architect’s client and the main contractor. Any subcontractor has a direct contractual relationship with the main contractor. The procedure continues until the building is ready to occupy.

Design-build

This approach has become more common in recent years, and also involves the client contracting a single entity that both provides a design and builds it. In some cases, the design-build package can also include finding the site, arranging funding and applying for all necessary statutory consents.

The owner produces a list of requirements for a project, giving an overall view of the project’s goals. Several D&B contractors present different ideas about how to accomplish these goals. The owner selects the ideas they like best and hires the appropriate contractor. Often, it is not just one contractor, but a consortium of several contractors working together. Once these have been hired, they begin building the first phase of the project. As they build phase 1, they design phase 2. This is in contrast to a design-bid-build contract, where the project is completely designed by the owner, then bid on, then completed.

Kent Hansen pointed out that state departments of transportation usually use design build contracts as a way of progressing projects when states lack the skills-resources. In such departments, design build contracts are usually employed for very large projects.

 अत्यधिक पढ़ा गया लेख: 8M+ Viewers
सनातन संस्कृति मे पौराणिक कथाओं के साथ-साथ मंत्र, आरती और पुजा-पाठ का विधि-विधान पूर्वक वर्णन किया गया है। यहाँ पढ़े:-

Management procurement systems

In this arrangement the client plays an active role in the procurement system by entering into separate contracts with the designer (architect or engineer), the construction manager, and individual trade contractors. The client takes on the contractual role, while the construction or project manager provides the active role of managing the separate trade contracts, and ensuring that they complete all work smoothly and effectively together.

Management procurement systems are often used to speed up the procurement processes, allow the client greater flexibility in design variation throughout the contract, give the ability to appoint individual work contractors, separate contractual responsibility on each individual throughout the contract, and to provide greater client control.

In recent time, construction software starts to get traction—as it digitizes construction industry. Among solutions, there are for example: Procore, GenieBelt, PlanGrid, bouw7, etc.

Sustainability in construction

Sustainability during the construction phase is one of the aspects of “green building,” defined by the United States Environmental Protection Agency (EPA) as “the practice of creating structures and using processes that are environmentally responsible and resource-efficient throughout a building’s life-cycle from siting to design, construction, operation, maintenance, renovation and deconstruction.

Safety

Construction is one of the most dangerous occupations in the world, incurring more occupational fatalities than any other sector in both the United States and in the European Union. In 2009, the fatal occupational injury rate among construction workers in the United States was nearly three times that for all workers, with Falls being one of the most common causes of fatal and non-fatal injuries among construction workers. Proper safety equipment such as harnesses, hard hats and guardrails and procedures such as securing ladders and inspecting scaffolding can curtail the risk of occupational injuries in the construction industry. Other major causes of fatalities in the construction industry include electrocution, transportation accidents, and trench cave-ins.

Other safety risks for workers in construction include hearing loss due to high noise exposure, musculoskeletal injury, chemical exposure, and high levels of stress. Construction has been identified by the National Institute for Occupational Safety and Health (NIOSH) as a priority industry sector in the National Occupational Research Agenda (NORA) to identify and provide intervention strategies regarding occupational health and safety issues.

Construction output by country

List of countries with the largest construction output in 2015
Economy Construction output in 2015 (billions in USD)

(01) China- 1,849
(02) United States- 599
(03) Japan- 569
(04) India- 333
(05) France- 147
(06) Germany- 143
(07) Singapore- 131
(08) Canada- 131
(09) Australia- 115
(10) Russia- 111
(11) Brazil- 109
(12) Italy- 107
(13) Spain- 104
(14) Indonesia- 93
(15) Mexico- 92
(16) South Korea- 58
(17) Turkey- 35
(18) United Arab Emirates- 34
(19) Venezuela- 34
(20) Netherlands- 34
(21) Poland- 34
(22) Switzerland- 33
(23) Saudi Arabia- 32
(24) Iran- 29
(25) Colombia- 29

The twenty-five largest countries in the world by construction output (2012)